Case Study

Integrated Design: Learning from Building to Building (SCROB and Cambria)

With support from The Heinz Endowments, Alan Barak of the Penn Energy Project assembled a green team to assist with the design of the 78,000 ft

2 (7,250 m

Read the full article for free with a BuildingGreen Basic membership

Get a free basic membership »
Firm or campus members – click here »

Already a member? Log in now

Published April 1, 2001

(2001, April 1). Integrated Design: Learning from Building to Building (SCROB and Cambria). Retrieved from https://www.buildinggreen.com/case-study/integrated-design-learning-building-building-scrob-and-cambria