Product Review

All-in-One Sheathing and Air Barrier Speeds Construction

The Securock ExoAir 430 system combines USG’s gypsum sheathing with a factory-applied air-and-water barrier from Tremco for jobsite quality control.

Proper air-barrier installation requires careful application and attention to detail, and controlling the quality of liquid membranes and sealants applied to gypsum sheathing onsite can be particularly challenging. To simplify the process, USG and Tremco have teamed up to offer the Securock ExoAir 430 building envelope system.

The system takes USG’s fire- and mold-resistant Securock glass-mat-faced gypsum sheathing and factory coats it with with Tremco’s vapor-permeable ExoAir 230 air- and water-resistant-barrier. Add Tremco’s accessory sealants, and Securock ExoAir 430 provides a one-stop, packaged building envelope system that should speed installation and provide several other performance and environmental benefits.

This article is BuildingGreen Premium content

Two ways to read the full article and get CEUs:

Sign up for BuildingGreen Premium to access all our premium content

Join for just /month »

Purchase this article to get online access and a printable PDF.

Buy it now for  »

Already a premium member? Log in now

To read the full article, subscribe now to BuildingGreen Premium

For full access, sign up now for LEEDuser Premium

LEEDuser tip sheets, written by our team of LEED experts, fill gaps in knowledge we’ve observed between the LEED Reference Guide, LEED Online, and LEED Interpretations. We update them regularly so that our members get the most relevant guidance for current issues on their projects.

( does not provide premium access to BuildingGreen)

Go premium for just  » Go premium for just  » Firm or campus members – click here »

Your 15-day free trial expired on

Already a premium member? Log in now

Published July 6, 2015

Ehrlich, B. (2015, July 6). All-in-One Sheathing and Air Barrier Speeds Construction. Retrieved from https://www.buildinggreen.com/product-review/all-one-sheathing-and-air-barrier-speeds-construction