Baseline energy use intensity for the Power House in St. Louis, a 1928 building adapted by Cannon Design for its regional office, was 182 kBtu/ft2, while modeled design projected 139 kBtu/ft2. Actual energy use in the building’s first year of operation exceeded expectations at 91 kBtu/ft2.
Photo: Cannon Design and James Steinkamp Photography