This elementary school assembly could have been air-sealed at the top of the wall, simplifying the assembly and providing air-barrier continuity. BECx would have found a mistake like this early; instead, the problems were discovered when the building failed its air-leakage test. When a fogger was used to identify where the building was leaking, fog was seen leaving the building through all the pathways shown here.
Image: Pie Consulting Engineering