The Ballenger Creek Living Machine in Frederick Country, Maryland was designed to treat 30,000 gallons of wastewater per day (114,000 l/d). Not included in this schematic are pretreatment and post-treatment stages, which are performed at this facility by the adjacent conventional wastewater facility. At the South Burlington, Vermont Living Machine the wetland is replaced by additional tanks with aeration and ecological fluidized beds.
Source: Living Technologies, Inc.