News Brief

Engineers Post Electrification Equipment Wish List

Leading MEP design firms are entreating manufacturers to make products needed for all-electric buildings, like large capacity heat pumps.

These 24 firms, representing thousands of practicing MEP engineers, are collectively asking equipment providers to help them design all-electric building systems.

Image: BuildingGreen, Inc.
This article highlights an initiative of the Sustainable MEP Leaders peer network, one of several peer networks supported by BuildingGreen. While BuildingGreen convenes the networks, initiatives are entirely directed by the participants.

As momentum builds for electrification—with some cities going so far as to ban natural gas—MEP engineers are increasingly being asked to deliver all-electric buildings. But in some cases, the kind of HVAC equipment needed isn’t currently on the market. Rather than passively wait for solutions, a group of engineers is turning to partners in manufacturing and laying out exactly the kind of equipment it’s searching for.

The Sustainable MEP Leaders peer network, consisting of sustainability directors for mechanical, electrical, and plumbing (MEP) design firms throughout North America, has drafted a letter to manufacturers asking for certain kinds of equipment. Among the many asks are requests for:

  • air-to-water heat pumps that produce warmer water at 0°F ambient temperatures, especially for large-capacity systems
  • water-to-water domestic heaters
  • small- to medium-sized battery systems (50 kWh–200 kWh)

The letter also clarifies that such equipment should use low-global-warming potential refrigerants and ideally have Environmental Product Declarations (EPDs).

Manufacturers are asked to keep the MEP engineers leaders “apprised of their progress,” and, in turn, the MEP engineers offer to continue helping manufacturers identify the “rapidly expanding demand” for equipment needed to decarbonize the building industry.

Published January 17, 2020

Pearson, C. (2019, December 20). Engineers Post Electrification Equipment Wish List. Retrieved from https://www.buildinggreen.com/newsbrief/engineers-post-electrification-equipment-wish-list

Add new comment

To post a comment, you need to register for a BuildingGreen Basic membership (free) or login to your existing profile.

Comments

January 23, 2020 - 11:02 am

There are in fact some small to medium battery systems on the market. Some of them require extensive design and engineering to gather all of the needed equipment separately and then add controls and other features but this can be a challenge for those new to Energy Storage. CPS has developed a turnkey AC coupled commercial Energy Storage product complete with thermal management, fire protection, controls and our bi-directional inverters. Further you can work with CPS as the leader in commercial PV inverters to amplify customer savings by combining PV & ES.